Estimate updated by reno357.
Construction / Painting
RESTOREATION:
Install new studs sections to secure and complete stud installation
Install new bottom plates (walls)
Install new insulation
Install new drywall in all the areas where it was removed
Install new baseboard in all exterior walls
FLOORING:
Remove existing flooring
Install/apply concrete to level flooring in all areas where tile was removed
Install flooring (re-use some off the previous flooring and new flooring)
Material include:
Studs
Insulation
drywall
concrete
building materials
baseboard
Etc.
Material NOT included:
New Laminate Flooring needed****