BATHROOM REMODELING Justine & Michael A.

100% Complete

Project Description

Bathroom Remodeling & Bedroom Painting 

Full description can be found in estimates -------------------->

 

Edit Description

Project Progress

100% Progress

100% Timing

Start Date

September 18, 2019

End Date

October 16, 2019

2/2

Approved Documents

2/2

Complete Milestones

5/5

Complete Phases

27/27

Complete Tasks

Milestones

2 / 2 Completed

100%

  • 0%
  • 100% 100% at the end of projectOctober 8, 2019

Phases

Expand Discussions | 5 / 5 Completed

Demolition 0 Documents 6 / 6 Tasks 0 Responses

100%
Description

Demolition Begins!

Remove & dispose of existing flooring, baseboard etc.
Remove & dispose of wall tile
Remove & dispose of shower surround & base
Remove & dispose of existing fixtures; toilet etc.
Remove & keep vanity/sink
Remove & keep shower door

 

0/0 No Documents Phase Documents

No documents attached to this phase.

Discussion 0

Leave a Reply

Your email address will not be published. Required fields are marked *

Electrical & Plumbing 0 Documents 4 / 4 Tasks 0 Responses

100%
Description

Install new shower system & drain as needed
Re adjust vanity sink drain/plumbing
Re-wire for two new light fixtures one in each side of the mirror

0/0 No Documents Phase Documents

No documents attached to this phase.

Discussion 0

Leave a Reply

Your email address will not be published. Required fields are marked *

Building #1 0 Documents 5 / 5 Tasks 0 Responses

100%
Description

Build new shower pan
Install new concrete board in shower surround
Build/frame 1-2 soap niches
Install drywall where tile to be removed (walls behind vanity)
Water proof walls & shower pan

0/0 No Documents Phase Documents

No documents attached to this phase.

Discussion 0

Leave a Reply

Your email address will not be published. Required fields are marked *

Building Part 2 0 Documents 11 / 11 Tasks 0 Responses

100%
Description

Install wall tile in shower surround & niches
Install tile in shower floor
Install new shower curb
Install concrete boards in subfloor (vanity & toilet area)
Install new floor tile
Install new baseboard
Install new vanity, sink, faucet, drain towel fixtures etc.
Install new toilet
Install new shower doors
Install new light fixtures
Install new mirror

0/0 No Documents Phase Documents

No documents attached to this phase.

Discussion 0

Leave a Reply

Your email address will not be published. Required fields are marked *

Painting 0 Documents 1 / 1 Tasks 0 Responses

100%
Description

Paint walls ceiling & trim

0/0 No Documents Phase Documents

No documents attached to this phase.

Discussion 0

Leave a Reply

Your email address will not be published. Required fields are marked *

Edit Phase

Project Discussion No discussions posted at this time

Leave a Reply

Your email address will not be published. Required fields are marked *

Update Status

Document Status Updated

Notifications have been sent.

Loading

Add Document