30 Mount Vernon Ave, Debbie Stone (PROJECT COMPLETED)
DEBBIE STONE
100% Complete
Project Progress
100% Progress

100% Timing

Start Date
June 22, 2021
End Date
July 20, 2021
4/4
Approved Documents
1/1
Complete Milestones
5/7
Complete Phases
23/25
Complete Tasks
Project Description

kitchen cabinets are begin painted, granite installation

Deck area painting

Supply & install four new windows (pending final cost)

Build new entry porch area with metal roof, material & labor included

Paint exterior in front & back of property material & labor included

Install recess lights in upper and main level (approx. 10 recess lights ( kitchen & living room)

Re-wire switches

BATHROOM UPPER LEVEL:

Replace vanity & faucet/fixtures

(Labor only)

Re-caulk caulking in bathrooms

Change/refresh grout

Bathroom Basement area:

Refresh/clean grout and caulking

PAINTING:

Estimate to paint whole house walls, ceilings, doors and trims.

Material & labor included

KITCHE:

Remove/cut wall (bar in kitchen area so countertop is even.

Re-locate base and wall cabinets to accommodate fridge in new location

Install new ice maker in new fridge location

relocate light fixture and dining room light switch

Install new appliances (microwave, stove, dishwasher et.)

Paint Deck area railing etc.

material included

BASEMENT EXTERIOR STAIRCASE:

Repair concrete floor (steps etc)

Prime & paint walls

Paint floor/steps with epoxy base paint

MATERIALS:

2 Ceiling fans (upper level bedrooms)

Bathroom vanity

Bathroom faucet & light fixture

Back area light fixture($60

Dining room light fixture ($120)

Edit Description
Milestones
1 / 1 Completed
100%
40% 1
Project Milestones
40%
Deposit 40% ($9598) June 29, 2021

Deposit in advance for materials

Phases
Expand Discussions | 5 / 7 Completed
Supply & install four new windows 0 Documents 2 / 2 Tasks 0 Responses
100%
No documents attached to this phase.
Leave a Reply
Your email address will not be published. Required fields are marked *

Painting exterior walls 0 Documents 1 / 1 Tasks 0 Responses
100%
No documents attached to this phase.
Leave a Reply
Your email address will not be published. Required fields are marked *

Kitchen Repairs 0 Documents 8 / 9 Tasks 0 Responses
99%
No documents attached to this phase.
Leave a Reply
Your email address will not be published. Required fields are marked *

Interior Painting 0 Documents 2 / 3 Tasks 0 Responses
97%
No documents attached to this phase.
Leave a Reply
Your email address will not be published. Required fields are marked *

Deck area 0 Documents 2 / 2 Tasks 0 Responses
100%
No documents attached to this phase.
Leave a Reply
Your email address will not be published. Required fields are marked *

BASEMENT EXTERIOR STAIRCASE: 0 Documents 3 / 3 Tasks 0 Responses
100%
No documents attached to this phase.
Leave a Reply
Your email address will not be published. Required fields are marked *

BUY MATERIALS 0 Documents 5 / 5 Tasks 0 Responses
100%
No documents attached to this phase.
Leave a Reply
Your email address will not be published. Required fields are marked *

Send Notification

Message Sent

Edit Phase
Add Phase
Project Discussion No discussions posted at this time

Your email address will not be published. Required fields are marked *

Loading
Add Document
Update Status
Document Status Updated
Notifications have been sent.
Loading
Add Document